Every guide on this site answers one question a London homeowner, landlord or business actually asks — with the 2026 price, the regulation it comes from, and what we would do about it. All prices are labour-only from F & A Electrical, NICEIC registered, Tottenham N15, 9.32/10 from 242 reviews. If your question isn’t here, call 07407 627542 and we’ll answer it — and probably write the guide.
EICR basics
- Do I need an EICR? — who it is compulsory for, who it is sensible for
- What does an EICR actually check? — the 9 tests, what a fail on each means
- How long does an EICR take? — timings by property type
- How many circuits does an EICR cover? — and why circuits set the price
- EICR codes explained: C1, C2, C3 and FI
- What is a C2 on an EICR? — the 15 most common C2 faults in London homes
- What does a limitation on an EICR mean? — agreed vs operational, is the report still valid
- No main earth — what does it mean on an EICR? — why it is a C1, who provides the earth and what the fix costs
- Main bonding cost in London — gas and water bonding, the 10 mm rule, when you do not need it at all
- EICR unsatisfactory — what happens next?
- Who can carry out an EICR? — does it have to be NICEIC
- EIC vs EICR — what is the difference?
- How often should electrics be checked?
- EICR renewal — when the five years actually start
- EICR vs PAT testing — which one you need
Landlords, tenants and compliance
- Landlord electrical compliance checklist — everything the council and the licence ask for
- Landlord electrical safety certificate — complete guide
- EICR fines: £30,000 or £40,000? — the definitive answer since 1 May 2026
- How London councils apply EICR penalties
- Renters’ Rights Act 2026 — what changed for landlord electrics
- Tenant refusing access for the EICR — the “all reasonable steps” procedure, notice wording
- Do I need a new EICR for a new tenant?
- Does a new-build need an EICR?
- EICR for an Airbnb or short-term let
- EICR for a leasehold flat and communal areas — who pays for what
- HMO EICRs — prices by bedrooms, licence conditions
- HMO electrical compliance — alarms, emergency lighting, AFDDs
- AFDD consumer units for HMOs
- Smoke alarm regulations for London landlords
- Electrical safety for tenants — your rights
- Do I need an EICR to sell my house?
- Buying a property — electrical checklist
- Who signs off communal electrical work in a block? — freeholder, RMC or agent, permits to work and who may isolate the landlord’s supply
- Electrician for letting agents in London — who instructs, who holds the duty, authority to spend, access and the 28-day clock
Special premises
- Commercial EICR cost — price per circuit, intervals by premises type
- EICR for a shop with flats above — three installations, three reports, who pays
- EICR for a railway arch, lock-up or industrial unit — 3-year interval, the lease
- EICR for a nursery, pre-school or childminder — what Ofsted and insurers ask for
- EICR for a care home or supported living — CQC vs tenancy rules, hoists and nurse call
- Does an EICR cover the garage, shed or garden office?
- Office-to-residential conversion — EICR, EIC or both? — Class MA, splitting the supply, certificate pack
- PAT testing — £5 per appliance, £108 minimum
- PAT testing — what every business needs to know
- Fire alarm installation — costs and regulations
- Emergency lighting certificate cost — the three documents you need, BS 5266-1:2025, annual test from £180
- Commercial electrical costs — full guide
Prices and costs
- EICR cost London 2026 — the full ladder
- EICR remedial work costs — what each C1/C2/C3 fix costs
- Electrician prices London 2026 — every common job
- How much does an electrician cost in London?
- House rewire cost London 2026
- Cost to rewire a flat in London — leasehold consent, concrete floors, prices by size
- How long does a house rewire take?
- Fuse board replacement cost — from £550 labour-only
- Why a £150 fuse board quote should worry you
- Cost to move a fuse box — £350–£1,100 by distance
- Landlord’s board and split supply cost — separate sub-mains and meters for flats
- Cost of adding sockets
- Downlight installation cost — £35–£85 per light, fire-rated LED
- EV charger installation cost
- Kitchen electrical requirements and costs
- Out-of-hours electrician cost — the half-hourly supplement, permits, goods lifts and parking
Faults and emergencies
- Who is responsible for the main fuse, cut-out and meter tails? — UK Power Networks, your supplier or your electrician
- Fuse box keeps tripping — same-day electrician
- Why does my fuse board keep tripping? — 12 causes and fixes
- RCD won’t reset
- Socket not working
- Burning smell from a socket
- 7 warning signs of dangerous wiring
- 7 electrical fire hazards hiding in a London home
- 10 signs your fuse board needs replacing
- What to do in an electrical emergency
Boards, wiring and regulations
- Consumer unit upgrade — when to replace your fuse board
- Do I need an electrician to change a consumer unit?
- Ex-council flat — new fuse board or a full rewire? — what the EICR decides, Decent Homes part-rewires, and who owns the riser
- What is Part P certification?
- Part P and Building Control notification — what is notifiable, who notifies it, and what to do about work nobody told the council about
- What paperwork should I have after electrical work? — EIC, minor works certificate, Building Regulations compliance certificate and EICR, and which one your solicitor wants
- Rewiring a listed building or conservation area home — listed building consent vs planning vs Part P, and the no-chase method
- Bathroom electrics — zones and regulations
- How many sockets on a ring main?
- BS 7671 Amendment 4 (2026) — what it means for you
- New electrician competence rules 2026
- How to choose an electrician in London — 10 things to check
- Why NICEIC matters
- Smart meter installer refused to fit? — why engineers abort and what the fix costs
EV chargers, heating and smart homes
- EV charger installation London — 2026 guide — models, prices, supply upgrades
- Can I install an EV charger if I live in a flat?
- Article 4 directions and EV chargers — when a charge point needs planning permission in London, conservation areas, listed buildings and the 21 October 2026 rule change
- Heat pump electrical considerations
- Smart home electrical wiring
- LED lighting upgrade
- Outdoor and garden lighting
- Electric shower installation
Where we work
Every borough and neighbourhood page, with local prices and the wiring we find there, is on the London service areas hub. Haringey, Hackney, Islington, Enfield, Waltham Forest, Camden, Barnet, Newham and Tower Hamlets from Tottenham N15. Call 07407 627542 or 07500 721453.
