Adding power to a garage, workshop, garden office or outbuilding? F & A Electrical fits full electrical installations for outbuildings across London — dedicated SWA sub-main from your house, mini consumer unit in the outbuilding, multiple sockets, LED lighting, EV charger ready. From £780 inc VAT for a basic garage with 2 sockets + 1 light, up to £4,500+ for full workshop with 3-phase. NICEIC certified, Part P notified, 6 years’ warranty. Call 07407 627542 or 07500 721453.

Garage / workshop pricing — London 2026

Setup Price (inc VAT)
Basic garage — 2 sockets + 1 LED light (short cable run from house) £780–£1,100
Single-vehicle garage — 4 sockets + 2 lights + isolator + sub-board £1,200–£1,700
Double garage — 6 sockets + 3 lights + sub-main + EV-charger ready £1,600–£2,400
Full workshop — 8-12 sockets, dedicated tool circuit, lighting, heating, sub-main £2,200–£4,500
Garden office cabin — sub-main + 4-6 sockets + lights + data + heater £1,400–£2,800
3-phase workshop (CNC, welding, compressor) £3,500–£8,500+
EV charger added to garage install (Zappi/Ohme/Pod Point) +£550–£900
SWA sub-main only (per metre, trenching by you) £25–£40 per metre

All-in: SWA armoured cable from house consumer unit to outbuilding, mini consumer unit in the outbuilding (Hager or Schneider), all sockets + lights + isolators, NICEIC certification, Part P notification via NICEIC, full Electrical Installation Certificate (EIC), 6 years’ NICEIC installation warranty.

What we typically install in a garage or workshop

Common garage / workshop scenarios

What’s included in a standard garage / workshop install

  1. Site survey — measure cable route, confirm earthing system, check existing consumer unit capacity, identify wall penetrations
  2. Quote with fixed price for the agreed scope
  3. Trenching — by you (cost saving) or by us (+£25-£40/m). Cable buried at 600mm minimum, sand bed, marker tape.
  4. SWA cable installation — pulled in, terminated at house end (via gland) and outbuilding end
  5. House-end RCBO at consumer unit (40A or 50A typically)
  6. Outbuilding consumer unit — Hager VML or Schneider Easy9, surface-mounted, fully labelled
  7. First-fix wiring — sockets, lights, isolators all wired and tested
  8. Second-fix accessories — switch plates, socket faces, light fittings
  9. Test — insulation resistance, polarity, Zs, RCD trip time, continuity
  10. Issue EIC + Part P notification via NICEIC. Building Control notified automatically.
  11. 6 years’ NICEIC installation warranty

EV charger ready — pre-wire while we’re there

If you’re getting electrical work done in the garage, run the EV charger cable NOW even if you don’t have an EV yet. Adding 10mm² SWA + Type B RCD ready for a Zappi/Ohme/Pod Point install later costs maybe £200-£400 extra. Retrofitting it later costs £550-£900. The economics are obvious.

For full EV charger install detail see our EV Charger Installation + EV Charger Cost London pages.

Common upgrade scenarios — what bumps the price

Scenario Cost on top (inc VAT)
House consumer unit can’t accept new sub-main RCBO +£550-£950 (board upgrade)
Long cable run (over 25m) +£25-£40 per extra metre
3-phase supply where domestic is single-phase +£800-£2,500+ (DNO involvement)
Underground rock / hard pan in trench route POA — trenching surcharge
EV charger added during install +£550-£900
Smart lighting / heating control +£280-£550

FAQ — garage & workshop electrical London

Can I do the trenching myself?
Yes — most customers do. We tell you exactly where to dig (600mm deep, 300mm wide), and we lay the cable + sand + marker tape when we’re on site. Saves £500-£1,500.

Do I need Building Regs approval?
For domestic outbuildings the Part P notification we file via NICEIC covers Building Control. No separate approval needed for most residential garages/workshops/cabins.

How long does the install take?
Half a day for basic 2-socket setup. 1 day for typical garage with sub-main. 2-3 days for full workshop or garden office.

Can you do consumer unit upgrade at the same time?
Yes — combining the house consumer unit upgrade with the new sub-main is much cheaper than two separate visits. £550-£950 extra for the board upgrade.

What if my outbuilding has its own water/gas supply?
We bond all incoming services to the local outbuilding earth and confirm equipotential bonding to BS 7671 spec.

Are you NICEIC certified?
Yes — NICEIC Approved Contractor, £5m public liability, Part P registered. Every install gets a sequential NICEIC certificate verifiable online.

Book your garage / workshop installation

Call 07407 627542 or 07500 721453, or email info@faelectrical.co.uk. Send us:

Fixed-price quote within the hour. Booking within 1-2 weeks for larger installs.

Related: EV Charger Installation · Outdoor Sockets London · Three-Phase Electrician (Commercial) · Fuse Board Replacement Cost · All London service areas

Related: does an EICR cover the garage, shed or garden office?

Need the inspection rather than the installation? See EICRs for railway arches and industrial units.