Same-Day EICR London — Conveyancing & Solicitor Emergency Service

Solicitor flagged an EICR on your exchange? F & A Electrical attends same-day across north, east, central and inner south London. NICEIC-certified. Satisfactory cert reissued within 24–48 hours. Fixed-fee remedials quoted on the spot. Call 07407 627542 or 07500 721453 — we keep slots open every weekday for conveyancing emergencies.

Same-day EICR pricing — London

Property type Same-day EICR price Cert reissue turnaround
Studio / 1-bed flat £190 (£140 + £50 priority) Same-day digital PDF
2-bed flat £220 Same-day digital PDF
3-bed flat / terrace £250 Same-day digital PDF
4-bed house £300 Same-day digital PDF
5-bed+ / HMO £350–£550 24–48 hours
If remedials required, satisfactory re-cert Fixed-fee quoted on site 24–48 hours after work signed off

All prices include VAT, inspection, full report and NICEIC certification. No call-out fee on top.

What happens when a solicitor flags the EICR

Conveyancing solicitors increasingly request the seller’s EICR before exchange. The three most common reasons we get the panic call:

Any of those can stall exchange. The fix is usually 24–48 hours of focused work, not a multi-week project.

Our same-day conveyancing process

From your first call to satisfactory cert in the solicitor’s inbox, the process runs in four stages:

  1. Hour 0–1: Phone triage. You call, we ask for the property address, the solicitor’s reference, a photo of the current consumer unit (if accessible), and the report (if there is one). We confirm fixed price and arrival window.
  2. Hour 1–8: Attendance. We arrive in the agreed window with full test equipment. Inspection runs 90 minutes to 4 hours depending on property size. If remedials are needed, we quote them at fixed prices before leaving site — no surprise bills.
  3. Hour 8–24: Remedial work (if needed). Most C1/C2 remedials are clearable in one return visit. Common: replace consumer unit, supplementary bonding, fix damaged accessories, replace tripping RCDs, install missing earthing.
  4. Hour 24–48: Satisfactory cert in solicitor’s inbox. NICEIC-certified Electrical Installation Condition Report, signed satisfactory, with copies of all remedial certificates. Sent direct to you and to the solicitor’s email — solicitor-ready format with NICEIC registration number and contractor stamp.

Why solicitors and buyers accept our reports

Same-day callout coverage — London

We hold same-day conveyancing slots every weekday across:

Outer London and home-counties properties (Hertfordshire, Essex, Surrey) — call us; same-day usually still possible with a small travel surcharge.

Common remedials on conveyancing EICRs (priced)

Issue commonly flagged Fixed-fee remedial
1990s wooden / Wylex / MEM consumer unit (C2 — no RCD protection) £550–£950 (full RCBO-protected board, NICEIC cert)
Missing supplementary bonding in bathroom / kitchen (C2) £85–£200
Cracked or burnt sockets / switches (C2/C3) £25 each fitted
RCD failing trip-time test (C2) £85–£180 each
Damaged earthing or main bonding (C1/C2) £120–£300
FI — further investigation required (suspected hidden damage) £150–£400 depending on access
Lighting circuit fault £140–£280
Cooker circuit termination issue £90–£180

Fixed prices, quoted in writing before any work starts. You’re free to take the report to another contractor if you prefer — there’s no obligation.

Conveyancing EICR FAQ

Can you really attend same day?
On weekdays, yes — most calls before 11am get an afternoon slot, calls between 11am–2pm get next-morning. We keep two same-day slots ringfenced every weekday for conveyancing emergencies. Saturday/Sunday emergencies attract a £150 weekend surcharge.

What does the solicitor actually need?
A satisfactory EICR less than 5 years old (most commercial mortgage lenders prefer less than 1 year). The PDF needs NICEIC certification, sequential cert number, contractor stamp, and “satisfactory” tick on the front page.

What if the property fails badly and remedials take longer than 48 hours?
We agree a fixed re-attendance date with you on inspection day. Most C2 cases clear within 48 hours; full rewires take 3–7 days but conveyancing lenders will usually accept “remedial works in progress with fixed completion date” as a temporary undertaking, letting exchange proceed.

Can you invoice my solicitor or estate agent directly?
Yes — many solicitors prefer to roll the EICR cost into completion via a disbursement. Just give us the solicitor’s name and reference at booking. 7-day invoice terms.

What if the buyer’s surveyor disagrees with the EICR?
This happens — surveyors sometimes flag things the EICR didn’t (or vice versa). We’re happy to do a no-cost call with the surveyor to walk through findings and resolve disputes. Saves arguments at exchange.

Are you on solicitor / lender panels?
NICEIC Approved Contractor status puts us on every major UK lender’s accepted-contractor panel by default. We’re also directly known to many north London conveyancing firms — ask us if your solicitor needs a reference call.

Call now — same-day London EICR

Phone 07407 627542 · 07500 721453 · info@faelectrical.co.uk

For solicitors and conveyancing chains needing a regular contractor — we work with several north London firms on a rolling basis. Ask about the conveyancing-priority arrangement.

Related: EICR cost by property size · Landlord EICR — 2020 Regulations · What do C1, C2, C3 codes mean? · Do I need an EICR?

CALL NOW FREE QUOTE
24/7 Emergency Electrician — Fast response across London Call Now →